This Old House - Season 43 Episode 20 -
West Roxbury: Outdoor Oasis
At the house, out front we get to know the contractor while Ipe is being installed on the porch ceiling. Out back, a brick patio is laid. Inside, a dual fuel HVAC system is installed and ducts ran. At the Dracut Centre School, corbels are restored.
Please explain the problem in a few words.
Max 255 characters.
Max 255 characters.